A proposed massive new data centre would require more than six times the total demand of the Darwin and Katherine electricity grids to operate and be powered by gas piped direct from the Northern Territory's Beetaloo Bas
You are being forwarded to ABC Arts in a few seconds. Renegade Enterprises is a news aggregator — we credit, link, and attribute every story to its original publisher. If you are the rights holder and want this link removed, use our DMCA process.